archive-gr.com » GR » C » CMENGINEERING.GR

Total: 228

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • C&M Engineering S.A.
    API 5L X65 design pressure 70 barg cathodic protection system 2 scraper stations High Pressure Gas Pipeline to West Thessalia Ambelia Karditsa Trikala NPS 10 72 Km material API 5L X65 design pressure 70 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations relocation of two M R stations and RCC system High Pressure Pipeline to Aliveri Evia Island NPS 20 58 Km onshore and 14 Km offshore marine crossing material API 5L X65 design pressure 80 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations Metering Station at ADG Installation of Metering Station to feed the power plant in the industry Aluminium of Greece A D G at Aspra Spitia Viotia with max capacity 100 000 Nm3 h and installation of RCC system Metering Station at PPC Aliveri Evia Island Installation of metering station to feed the PPC power plant at Aliveri with max capacity 160 000 Nm3 h and installation of RCC system Nea Messimvria Compressor Station Installation of two gas turbine driven compressors with absorbed power 7 5 MW each operating flow range from 257 400 to 445 800 Nm3 h and pressure ratio 1

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/18_HPNG/18_HPNG_d.html (2016-02-13)
    Open archived version from archive


  • C&M Engineering S.A.
    API 5L X65 design pressure 70 barg cathodic protection system 2 scraper stations High Pressure Gas Pipeline to West Thessalia Ambelia Karditsa Trikala NPS 10 72 Km material API 5L X65 design pressure 70 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations relocation of two M R stations and RCC system High Pressure Pipeline to Aliveri Evia Island NPS 20 58 Km onshore and 14 Km offshore marine crossing material API 5L X65 design pressure 80 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations Metering Station at ADG Installation of Metering Station to feed the power plant in the industry Aluminium of Greece A D G at Aspra Spitia Viotia with max capacity 100 000 Nm3 h and installation of RCC system Metering Station at PPC Aliveri Evia Island Installation of metering station to feed the PPC power plant at Aliveri with max capacity 160 000 Nm3 h and installation of RCC system Nea Messimvria Compressor Station Installation of two gas turbine driven compressors with absorbed power 7 5 MW each operating flow range from 257 400 to 445 800 Nm3 h and pressure ratio 1

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/18_HPNG/18_HPNG_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    API 5L X65 design pressure 70 barg cathodic protection system 2 scraper stations High Pressure Gas Pipeline to West Thessalia Ambelia Karditsa Trikala NPS 10 72 Km material API 5L X65 design pressure 70 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations relocation of two M R stations and RCC system High Pressure Pipeline to Aliveri Evia Island NPS 20 58 Km onshore and 14 Km offshore marine crossing material API 5L X65 design pressure 80 barg cathodic protection system 3 line valve stations along the route and 2 scraper stations Metering Station at ADG Installation of Metering Station to feed the power plant in the industry Aluminium of Greece A D G at Aspra Spitia Viotia with max capacity 100 000 Nm3 h and installation of RCC system Metering Station at PPC Aliveri Evia Island Installation of metering station to feed the PPC power plant at Aliveri with max capacity 160 000 Nm3 h and installation of RCC system Nea Messimvria Compressor Station Installation of two gas turbine driven compressors with absorbed power 7 5 MW each operating flow range from 257 400 to 445 800 Nm3 h and pressure ratio 1

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/18_HPNG/18_HPNG_f.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    SCADA upgrade installation expansion of medium pressure transmission system MPTS and installation of low pressure distribution network More specifically Interconnection between Greece and Turkey consisting of High Pressure Pipeline between the G T Border and Komotini NPS 36 86 Km material API 5L X65 design pressure 80 bar cathodic protection system 4 line valve stations and 3 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in ten 10 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 200 km length NPS from 6 to 14 at Drama Komotini Phase B Serres Phase B Katerini Xanthi Phase C Thiva Inofyta Phase B Evia Lamia Kilkis PE Network 4 Bar at Inofyta Schimatari Area Phase A Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Corinth Area VI PE Larissa with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrade of technology other remote control and communication RCC works consisting of Remote Control of High Pressure Pipeline Valves of the N G T S Modification of 21 block valves on high pressure pipelines in order be remotely controlled through the existing SCADA system Improvement of Surge Lightning Protection in more than 60 existing line valve

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/20_CSF%20III/20_CSF%20III_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    SCADA upgrade installation expansion of medium pressure transmission system MPTS and installation of low pressure distribution network More specifically Interconnection between Greece and Turkey consisting of High Pressure Pipeline between the G T Border and Komotini NPS 36 86 Km material API 5L X65 design pressure 80 bar cathodic protection system 4 line valve stations and 3 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in ten 10 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 200 km length NPS from 6 to 14 at Drama Komotini Phase B Serres Phase B Katerini Xanthi Phase C Thiva Inofyta Phase B Evia Lamia Kilkis PE Network 4 Bar at Inofyta Schimatari Area Phase A Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Corinth Area VI PE Larissa with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrade of technology other remote control and communication RCC works consisting of Remote Control of High Pressure Pipeline Valves of the N G T S Modification of 21 block valves on high pressure pipelines in order be remotely controlled through the existing SCADA system Improvement of Surge Lightning Protection in more than 60 existing line valve

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/20_CSF%20III/20_CSF%20III_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    SCADA upgrade installation expansion of medium pressure transmission system MPTS and installation of low pressure distribution network More specifically Interconnection between Greece and Turkey consisting of High Pressure Pipeline between the G T Border and Komotini NPS 36 86 Km material API 5L X65 design pressure 80 bar cathodic protection system 4 line valve stations and 3 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in ten 10 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 200 km length NPS from 6 to 14 at Drama Komotini Phase B Serres Phase B Katerini Xanthi Phase C Thiva Inofyta Phase B Evia Lamia Kilkis PE Network 4 Bar at Inofyta Schimatari Area Phase A Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Corinth Area VI PE Larissa with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrade of technology other remote control and communication RCC works consisting of Remote Control of High Pressure Pipeline Valves of the N G T S Modification of 21 block valves on high pressure pipelines in order be remotely controlled through the existing SCADA system Improvement of Surge Lightning Protection in more than 60 existing line valve

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/20_CSF%20III/20_CSF%20III_d.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    SCADA upgrade installation expansion of medium pressure transmission system MPTS and installation of low pressure distribution network More specifically Interconnection between Greece and Turkey consisting of High Pressure Pipeline between the G T Border and Komotini NPS 36 86 Km material API 5L X65 design pressure 80 bar cathodic protection system 4 line valve stations and 3 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in ten 10 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 200 km length NPS from 6 to 14 at Drama Komotini Phase B Serres Phase B Katerini Xanthi Phase C Thiva Inofyta Phase B Evia Lamia Kilkis PE Network 4 Bar at Inofyta Schimatari Area Phase A Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Corinth Area VI PE Larissa with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrade of technology other remote control and communication RCC works consisting of Remote Control of High Pressure Pipeline Valves of the N G T S Modification of 21 block valves on high pressure pipelines in order be remotely controlled through the existing SCADA system Improvement of Surge Lightning Protection in more than 60 existing line valve

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/20_CSF%20III/20_CSF%20III_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    the national grid and the LNG unloading capacity from 3 500 m3 h via two unloading arms by ships of capacity 25 000 m3 to 7 250 m3 h via three unloading arms by ships of capacity 75 000 m3 Provided Services EPC contractor s detail design engineering review Review and control of the efficiency of all programs procedures and construction methods issued by the contractor Technical support to the

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/19_Revithousa/19_Revithousa_b.html (2016-02-13)
    Open archived version from archive