    thermal cracking unit flexicoker with a capacity of 20 000 bbl day the only one of its kind in Greece and just the second in Europe using Exxon know how and technology for converting crude residue into coke and clean gaseous fuel for the energy needs of the refinery A hydrogen production plant with a capacity of 120 000 Nm3 hour Auxiliary units air steam sulfur recovery amine water cooling and others The new refinery is characterized by its increased yield of middle distillates diesel jet fuel and modern and environmentally friendly standards which are in short supply in Europe and the Mediterranean region Respectively there is no output of low value high sulfur fuel oil the demand of which is steadily decreasing in the European market Also the refinery s operating conditions in terms of both safety as well as environmental impact were significantly upgraded Provided Services C M provided the following services A To HELLENIC PETROLEUM S A Technical Consultancy Services for Electrical Mechanical Works Design Review drawings specifications calculations Review control and administration of purchase orders for Electrical Mechanical Equipment Participation in Technical Meetings Technical Consultancy Services for Contracts Administration Monitoring control of terms conditions of contracts

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Elefsis%20Refinery/Elefsis_Refinery_f.html (2016-02-13)
    Open archived version from archive


  • C&M Engineering S.A.
    includes fifteen 15 remote controlled block valve stations along the route two 2 pipeline terminals with facilities of pumping 3 main line pumps flow metering pressure flow control pig launching and receiving impressed current cathodic protection system SCADA and control system telecommunication system leak detection system and ESD system Provided Services EPC contractor s project management during design engineering phase Time cost planning scheduling and control reporting Permits acquisition in

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Skopje/Skopje_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    includes fifteen 15 remote controlled block valve stations along the route two 2 pipeline terminals with facilities of pumping 3 main line pumps flow metering pressure flow control pig launching and receiving impressed current cathodic protection system SCADA and control system telecommunication system leak detection system and ESD system Provided Services EPC contractor s project management during design engineering phase Time cost planning scheduling and control reporting Permits acquisition in

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Skopje/Skopje_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    includes fifteen 15 remote controlled block valve stations along the route two 2 pipeline terminals with facilities of pumping 3 main line pumps flow metering pressure flow control pig launching and receiving impressed current cathodic protection system SCADA and control system telecommunication system leak detection system and ESD system Provided Services EPC contractor s project management during design engineering phase Time cost planning scheduling and control reporting Permits acquisition in

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Skopje/Skopje_d.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    includes fifteen 15 remote controlled block valve stations along the route two 2 pipeline terminals with facilities of pumping 3 main line pumps flow metering pressure flow control pig launching and receiving impressed current cathodic protection system SCADA and control system telecommunication system leak detection system and ESD system Provided Services EPC contractor s project management during design engineering phase Time cost planning scheduling and control reporting Permits acquisition in

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Skopje/Skopje_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    Refinery S A The Project concerns the erection of a gasoil hydrodesulphurization HDS unit U 800 capable to produce gasoil with 300 ppm w w sulphur content the construction of the associated interconnecting pipework and a new Flare Unit of 2 500 m3 h flow Provided Services Site survey at former location of the unit at refinery in Denmark Review of the as built drawings and mechanical catalogues relevant to

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Gasoil/Gasoil_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    Refinery S A The Project concerns the erection of a gasoil hydrodesulphurization HDS unit U 800 capable to produce gasoil with 300 ppm w w sulphur content the construction of the associated interconnecting pipework and a new Flare Unit of 2 500 m3 h flow Provided Services Site survey at former location of the unit at refinery in Denmark Review of the as built drawings and mechanical catalogues relevant to

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Gasoil/Gasoil_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    Refinery S A The Project concerns the erection of a gasoil hydrodesulphurization HDS unit U 800 capable to produce gasoil with 300 ppm w w sulphur content the construction of the associated interconnecting pipework and a new Flare Unit of 2 500 m3 h flow Provided Services Site survey at former location of the unit at refinery in Denmark Review of the as built drawings and mechanical catalogues relevant to