archive-gr.com » GR » C » CMENGINEERING.GR

Total: 228

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • C&M Engineering S.A.
    single shaft arrangement heat recovery steam generator air cooled condensers main feed water pump station main and auxiliary electrical buildings including MV and LV switchboards and UPS with batteries step up and step down power transformers emergency diesel generator control room administration building warehouses and workshop main and auxiliary pipe rack gas N2 H2 storage facilities greases and oils storage facilities facilities for storage treatment and distribution of industrial demineralized

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Power%20Plant%20Thiva/Power%20Plant%20Thiva_d.html (2016-02-13)
    Open archived version from archive


  • C&M Engineering S.A.
    single shaft arrangement heat recovery steam generator air cooled condensers main feed water pump station main and auxiliary electrical buildings including MV and LV switchboards and UPS with batteries step up and step down power transformers emergency diesel generator control room administration building warehouses and workshop main and auxiliary pipe rack gas N2 H2 storage facilities greases and oils storage facilities facilities for storage treatment and distribution of industrial demineralized

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/Power%20Plant%20Thiva/Power%20Plant%20Thiva_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    sets for the production of electrical power 3x50 150 MWe consuming natural gas of 15 000 Nm3 h total flow or alternatively diesel oil The project includes also utility systems and installations such as step up and step down power transformers MV and LV switchboards batteries systems UPS control room waste water treatment plant natural gas M R station and network diesel oil storage and distribution system facilities for storage

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/15%20MW%20Thiva/15%20MW%20Thiva_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    sets for the production of electrical power 3x50 150 MWe consuming natural gas of 15 000 Nm3 h total flow or alternatively diesel oil The project includes also utility systems and installations such as step up and step down power transformers MV and LV switchboards batteries systems UPS control room waste water treatment plant natural gas M R station and network diesel oil storage and distribution system facilities for storage

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/15%20MW%20Thiva/15%20MW%20Thiva_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    sets for the production of electrical power 3x50 150 MWe consuming natural gas of 15 000 Nm3 h total flow or alternatively diesel oil The project includes also utility systems and installations such as step up and step down power transformers MV and LV switchboards batteries systems UPS control room waste water treatment plant natural gas M R station and network diesel oil storage and distribution system facilities for storage

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/15%20MW%20Thiva/15%20MW%20Thiva_d.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    sets for the production of electrical power 3x50 150 MWe consuming natural gas of 15 000 Nm3 h total flow or alternatively diesel oil The project includes also utility systems and installations such as step up and step down power transformers MV and LV switchboards batteries systems UPS control room waste water treatment plant natural gas M R station and network diesel oil storage and distribution system facilities for storage

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/15%20MW%20Thiva/15%20MW%20Thiva_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    LNG The Power Station comprises 2 x 6 72 MWe gas engine generator sets complete with their auxiliary equipment heat recovery system fuel gas metering reducing station compressed air system with 34 Nm3 h 30 barg Air Compressors for G E sets and 95 Nm3 h 8 barg Service Air Compressors 22 m3 Lube Oil Storage Tank and forwarding system 47 m3 s forced air radiator coolers hot water system service make up pumping system 2 x 110 m 3 h HT Cooling Water Pumps 2 x 90 m3 h LT Cooling Water Pumps and 2 x 384 m3 h SCV water circulation pumps station auxiliary transformers MV LV switchboards DC system DCS control system communication and CCTV systems electrical and control interlocks with the existing substation and control system of LNG Terminal and the National Electrical Transmission Grid steel structures 2 x 30m steel stacks 585 m2 steel structure buildings concrete structures HVAC and fire fighting systems lighting small power grounding and lightning systems drainage system earthworks and various civil works Provided Services EPC contractor s detail design engineering review Review and control of the efficiency of all programs procedures and construction methods issued by the contractor Technical support

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/73_LNG%20Terminal/73_LNG%20Terminal_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    LNG The Power Station comprises 2 x 6 72 MWe gas engine generator sets complete with their auxiliary equipment heat recovery system fuel gas metering reducing station compressed air system with 34 Nm3 h 30 barg Air Compressors for G E sets and 95 Nm3 h 8 barg Service Air Compressors 22 m3 Lube Oil Storage Tank and forwarding system 47 m3 s forced air radiator coolers hot water system service make up pumping system 2 x 110 m 3 h HT Cooling Water Pumps 2 x 90 m3 h LT Cooling Water Pumps and 2 x 384 m3 h SCV water circulation pumps station auxiliary transformers MV LV switchboards DC system DCS control system communication and CCTV systems electrical and control interlocks with the existing substation and control system of LNG Terminal and the National Electrical Transmission Grid steel structures 2 x 30m steel stacks 585 m2 steel structure buildings concrete structures HVAC and fire fighting systems lighting small power grounding and lightning systems drainage system earthworks and various civil works Provided Services EPC contractor s detail design engineering review Review and control of the efficiency of all programs procedures and construction methods issued by the contractor Technical support

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/73_LNG%20Terminal/73_LNG%20Terminal_c.html (2016-02-13)
    Open archived version from archive



  •