    and Komotini NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in fourteen 14 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 231 km length NPS from 4 to 14 at Drama Komotini Phase B Serres Phase B including Hospital Kri Kri Industry Mitroussi Area Katerini Green Houses Of Imathia Xanthi Phase C including Industrial Area Hospital Police College Thiva including Hospital Inofyta Schimatari Halkida Misko Barilla Industry Inofyta Phase B Evia Lamia including Hospital Kilkis Ag Theodori Kalamaki Alexandroupolis including Hospital Evros Prefecture Kavala PE Network 4 Bar 95 km length at Inofyta Schimatari Phase A Inofyta Schimatari Halkida Thiva Lamia Kilkis Katerini Komotini including Hospital Xanthi Serres Drama including Hospital Alexandroupolis Evros Prefecture Kavala Halkida Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Industry Corinth Area VI PE Larissa Alexandroupolis with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrading of Ag Triada M Station Ano Liossia R Station Upgrade of technology other remote control and communication RCC works consisting of Remote Control of

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/17_CSF/17_CSF_b.html (2016-02-13)
    Open archived version from archive


  • C&M Engineering S.A.
    and Komotini NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in fourteen 14 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 231 km length NPS from 4 to 14 at Drama Komotini Phase B Serres Phase B including Hospital Kri Kri Industry Mitroussi Area Katerini Green Houses Of Imathia Xanthi Phase C including Industrial Area Hospital Police College Thiva including Hospital Inofyta Schimatari Halkida Misko Barilla Industry Inofyta Phase B Evia Lamia including Hospital Kilkis Ag Theodori Kalamaki Alexandroupolis including Hospital Evros Prefecture Kavala PE Network 4 Bar 95 km length at Inofyta Schimatari Phase A Inofyta Schimatari Halkida Thiva Lamia Kilkis Katerini Komotini including Hospital Xanthi Serres Drama including Hospital Alexandroupolis Evros Prefecture Kavala Halkida Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Industry Corinth Area VI PE Larissa Alexandroupolis with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrading of Ag Triada M Station Ano Liossia R Station Upgrade of technology other remote control and communication RCC works consisting of Remote Control of

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/17_CSF/17_CSF_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    and Komotini NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in fourteen 14 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 231 km length NPS from 4 to 14 at Drama Komotini Phase B Serres Phase B including Hospital Kri Kri Industry Mitroussi Area Katerini Green Houses Of Imathia Xanthi Phase C including Industrial Area Hospital Police College Thiva including Hospital Inofyta Schimatari Halkida Misko Barilla Industry Inofyta Phase B Evia Lamia including Hospital Kilkis Ag Theodori Kalamaki Alexandroupolis including Hospital Evros Prefecture Kavala PE Network 4 Bar 95 km length at Inofyta Schimatari Phase A Inofyta Schimatari Halkida Thiva Lamia Kilkis Katerini Komotini including Hospital Xanthi Serres Drama including Hospital Alexandroupolis Evros Prefecture Kavala Halkida Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Industry Corinth Area VI PE Larissa Alexandroupolis with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrading of Ag Triada M Station Ano Liossia R Station Upgrade of technology other remote control and communication RCC works consisting of Remote Control of

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/17_CSF/17_CSF_d.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    and Komotini NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in fourteen 14 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 231 km length NPS from 4 to 14 at Drama Komotini Phase B Serres Phase B including Hospital Kri Kri Industry Mitroussi Area Katerini Green Houses Of Imathia Xanthi Phase C including Industrial Area Hospital Police College Thiva including Hospital Inofyta Schimatari Halkida Misko Barilla Industry Inofyta Phase B Evia Lamia including Hospital Kilkis Ag Theodori Kalamaki Alexandroupolis including Hospital Evros Prefecture Kavala PE Network 4 Bar 95 km length at Inofyta Schimatari Phase A Inofyta Schimatari Halkida Thiva Lamia Kilkis Katerini Komotini including Hospital Xanthi Serres Drama including Hospital Alexandroupolis Evros Prefecture Kavala Halkida Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Industry Corinth Area VI PE Larissa Alexandroupolis with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrading of Ag Triada M Station Ano Liossia R Station Upgrade of technology other remote control and communication RCC works consisting of Remote Control of

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/17_CSF/17_CSF_e.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    and Komotini NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Border Metering Station at the Greek Turkish Border Fiscal and custody transfer metering of gas exported from Turkey into Greece Design pressure 80 bar MAOP 75 bar maximum design flow rate 11 6 bn m3 year 856 000 Nm3 h Expansions of the N G T S to feed new consumers in fourteen 14 areas of Greece consisting of High Pressure Pipeline to Corinth Area NPS 30 41 5 Km 20 1 5 Km material API 5L X65 design pressure 80 bar cathodic protection system 3 line valve stations and 2 scraper stations along the route Installation Expansion of Medium Pressure Transmission System Steel network 19 bar 231 km length NPS from 4 to 14 at Drama Komotini Phase B Serres Phase B including Hospital Kri Kri Industry Mitroussi Area Katerini Green Houses Of Imathia Xanthi Phase C including Industrial Area Hospital Police College Thiva including Hospital Inofyta Schimatari Halkida Misko Barilla Industry Inofyta Phase B Evia Lamia including Hospital Kilkis Ag Theodori Kalamaki Alexandroupolis including Hospital Evros Prefecture Kavala PE Network 4 Bar 95 km length at Inofyta Schimatari Phase A Inofyta Schimatari Halkida Thiva Lamia Kilkis Katerini Komotini including Hospital Xanthi Serres Drama including Hospital Alexandroupolis Evros Prefecture Kavala Halkida Installation of Metering and Pressure Reduction M R Stations at Drama Komotini Serres Katerini Xanthi Thiva Lamia Kilkis Motor Oil Industry Corinth Area VI PE Larissa Alexandroupolis with max capacity from 13 075 Nm3 h to 40 408 Nm3 h Upgrading of Ag Triada M Station Ano Liossia R Station Upgrade of technology other remote control and communication RCC works consisting of Remote Control of

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/17_CSF/17_CSF_f.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    the 800 MWe combined cycle power plant of P P C at Megalopolis in Peloponnese and to cover the needs of the urban commercial sector and of the small industries at various regions in Peloponnese The project consists of the following main facilities and components 158 km of 30 24 inch diameter high pressure gas pipeline Five Line Valve Stations Two Terminal Scraper Stations SCADA and Telecommunication System integrated with

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/4_PPC%20Megalopoli/4_PPC%20Megalopoli_b.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    the 800 MWe combined cycle power plant of P P C at Megalopolis in Peloponnese and to cover the needs of the urban commercial sector and of the small industries at various regions in Peloponnese The project consists of the following main facilities and components 158 km of 30 24 inch diameter high pressure gas pipeline Five Line Valve Stations Two Terminal Scraper Stations SCADA and Telecommunication System integrated with

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/4_PPC%20Megalopoli/4_PPC%20Megalopoli_c.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    the 800 MWe combined cycle power plant of P P C at Megalopolis in Peloponnese and to cover the needs of the urban commercial sector and of the small industries at various regions in Peloponnese The project consists of the following main facilities and components 158 km of 30 24 inch diameter high pressure gas pipeline Five Line Valve Stations Two Terminal Scraper Stations SCADA and Telecommunication System integrated with

    Original URL path: http://cmengineering.gr/Projects%20Html/Energy/4_PPC%20Megalopoli/4_PPC%20Megalopoli_d.html (2016-02-13)