    A The Project concerns the construction of natural gas pipelines and distribution network to all furnaces of Aluminium S A plant in Aghios Nikolaos Viotia It incorporates Metering station ESD valves isolating and safety valves underground and above ground pipes installation of gas trains and interconnection with Alumina Aluminum Foundry and other auxiliary burners Nominal capacity of the Metering Station is 25 000 m3 h at operating pressure 16 4barg

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Alluminium%20HFO-NG/Allu_NG.html (2016-02-13)
    Open archived version from archive


  • C&M Engineering S.A.
    The extension incorporates upgrading of existing process units installation of new equipment and all the associated modified or new interconnections Main units involving are Bauxite crushing line Grinding and Pre desilication Lime storage and conveying system Decantation and washing Filtering system Carbonate causticisation Evaporation system Cooling towers Precipitation and Classification section Oxalate extraction and causticisation section Digestion unit utilities interconnections etc Provided Services Basic design Engineering of process units comprising

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Alum_Feasibility_P520/Allu_520.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    housing the production unit for the bottling of natural mineral water transported through a 3 5 km long pipeline and the products warehouse as well as the administration and utilities building made of reinforced concrete The surrounding area works include roads paving parking area and underground networks Provided Services Project management Time and cost planning scheduling and control reporting Basic design design for building permits and detail design engineering of

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Water%20Stymfalia/Water%20Stymfalia.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    office facilities and utilities area of 2 350 m2 total covered area and 11 m height as well as surrounding area works in a plot of 5 300 m2 total surface Provided Services Project Management Design Coordination Detail design engineering for civil works structural works mechanical and electrical Installations Environmental impact assessment study Permits acquisition from authorities Tender documents preparation tender issue bids evaluation and contracting Time and cost planning

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Naftemporiki/Naftemporiki.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering.gr
    of Minerva S A The project concerns the reconstruction of the existing manufacturing plant of 8 000 m2 total covered area and the general services building of 1 055 m2 total covered area construction of new facilities including finished goods warehouse of 3 800 m2 total covered area and 11m height refinery building of 2 300 m2 total covered area and 16m height deodorizing tower of 25m height refinery services building of 750 m2 total covered area tank farm of 2 000 m2 total covered area utility systems steel pipe racks as well as surrounding area works landscaping underground networks paving in a plot of 100 000 m2 total surface The project also includes the relocation of edible oil and margarine production units from Moschato Attica to Schimatari Provided Services Project management Basic design design for permits issuance and detail design engineering of building works civil works structural works and mechanical and electrical installations Permits acquisition from authorities Tenders documents preparation tenders issue bids evaluation and contracting Time and cost planning scheduling and control reporting Construction management and supervision Construction contract administration Review of construction works time schedule Fulfilment verification of contractor s quality assurance quality control systems Fulfilment verification

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Food%20Manufacturing/Food%20Manufacturing.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    Company Construction of a finished goods distribution center of 50 000 m2 total covered area in a plot of 80 000 m2 total surface consisting of a warehouse building ground floor of 20 000 m2 covered area and basement of 20 000 m2 covered area and a warehouse building of 10 000 m2 covered area as well as surrounding area works landscaping parking area roads underground networks external lighting in

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/National%20Bank/National%20Bank%27.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    new steel buildings of 126 000 m2 total covered area renovation of existing concrete building of slaughter house meat processing sausage making of 8 000 m2 total covered area construction of a new building of slaughter house meat processing sausage making of 11 000 m2 total covered area renovation of an existing concrete administration offices building of 790 m2 total covered area and addition of a new storey of 725 m2 total covered area renovation of an existing building of dressing laundry room of 562 m2 total covered area construction of a new shelter for pigs resting calming of 600 m2 total covered area buildings for pigs breeding comprising of reconstruction of five existing steel buildings of 6 114 m2 total covered area and extension of a new steel building of 1 500 m2 total covered area including interconnecting walkways new building for utility systems of 3 250 m2 total covered area as well as surrounding area works roads paving drainage roads lighting and installation of mechanical and electrical systems Provided Services Project Management Basic and Detailed Design Engineering of Architectural Civil Structural Mechanical and Electrical Installations Permits Acquisition from Authorities Tender Documents Preparation and Bids Evaluation Time and Cost

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Hellas%20Farm/Hellas%20Farm.html (2016-02-13)
    Open archived version from archive

  • C&M Engineering S.A.
    a production plant consisting of three production units CAMEL shoe polish SANITAS SANITAS aluminum foil SARANTIS COSMETICS as well as office and administration facilities of 8 700 m2 total covered area and 11m height a finished goods warehouse of 15 000 m2 covered area and 11m height a supplementary production building for SANITAS of 552 m2 utility systems consisting of waste water treatment plant pump house for water supply fire fighting drivosol tanks water supply tanks alcohol tanks hvac building drilling pump house as well as surrounding area works landscaping U G networks paving in a plot of 46 000 m2 total surface The project includes also the relocation of the CAMEL existing production unit from Thivon Ave to Inofyta the relocation of SANITAS existing production unit from N Kifisia to Inofyta and the relocation of SARANTIS COSMETICS existing production unit from 26 Amarousiou Chalandriou Str to Inofyta Provided Services Project management Basic design design for permits issuance and detailed design engineering for civil works structural works and mechanical and electrical installations Permits acquisition from authorities Tenders documents preparation tenders issue bids evaluation and contracting Time and cost planning scheduling and control reporting Construction management and supervision Construction contracts administration

    Original URL path: http://cmengineering.gr/Projects%20Html/Industry/Sarantis/Sarantis.html (2016-02-13)